From the start to Aug. 07
For high definition, click on each picture until a new page open then click again on the picture you want to see in high definition (3 levels of definition).
-
-
-
-
-
-
-
-
-
2005-06 Trial / Galop d'essai (16)
Aurora left Europe January 2005 and arrived in Canada August the same year. -
-
Hull design and blueprints (9)
Architectural concept as well as accomodations and working/loading aera drawings. -
Insulation (35)
Aurora have 4 layers of insulation: 6mm of grained cork, 45mm of an high density polyurethan foam, 10mm of marine plywood, an other 4mm of grained cork. -
2003/2004 Construction (part 1) (26)
Started in September 2003, the hull and the cabin deck construction took 7 months. -
2003/2004 Construction (part 2) (18)
The metal work completed, Aurora Magnetica was then transported by road to La Rochelle (France). -
Thick aluminium construction details (18)
Aurora Magnetica has been built using the Strongal -reg- process.